Boluo Country, Guangdong Province

WST’s first commercial plant located in Boluo County of Guangdong Province of China, was completed at the beginning of 2008. After 6 months of testing and fine-tuning, operation started in June, 2008.

The plant’s capacity is 200 tons/day with wastewater treatment, biogas to electricity system, organic fertilizer system, etc.

The sorting line occupies 3000 area. All the mixed household waste can be sorted into non-organic fraction (rocks, glass, ceramics, etc.) , organic fraction, plastics, combustible fraction and ferrous metals. The inert fraction (rocks, glass, ceramics, etc.) is landfilled directly or crushed and used for producing pre-cast concrete products. Organic fraction mixed with scum and sludge within the wastewater is processed by a biogas fermentation system, which can quickly produce biogas for generating electricity. The residue after anaerobic digestion is an excellent raw material for producing organic fertilizer. Plastics can be used for producing light diesel. Combustible fraction is incinerated for heat. Ferrous metals is sold to the recycling factory directly.

WST technologies, including gasification, biogas to electricity, RDF and plastic to oil system is developed by the experts in Guangzhou Institute of Energy Conversion, Chinese Academy of Sciences. WST has signed a long term cooperation agreement with Chinese Academy of Sciences for jointly development of renewable energy related technology platform.

 





WST Administration Building

Automatic Feeding Device
Interior overview of Water Sorting System Interior overview of Water Sorting System
Interior overview of Water Sorting System Interior overview of Water Sorting System
Packaging Machine Wastewater Treatment System
Biogas System Chemi-Mechanical Pulping (CMP)

 

Shuyang Country, Jiangsu Province

WST got the first purchase order in 2007, the project with daily capacity of 300 tons is located in Shuyang County, Jiangsu province of China. The capital investment for the first phase construction is RMB12.5M and has been completed in the end of 2008. Testing has finished in first quarter of 2009 and started into operation.



Interior overview of Water Sorting System

Interior overview of Water Sorting System
Interior overview of Water Sorting System Interior overview of Water Sorting System
Interior overview of Water Sorting System Wastewater Treatment System

Back to Top


About Us Product WST Project Plant Design Patents Effectiveness Download What's New


WST INTERNATIONAL (HOLDINGS) LIMITED  Copyright 2004
2005 News Media Interviews Media Reports